We got a lot of things done today. I'm happy with the progress that my son and I made. Got the right front suspension installed along with a new CV shaft. I need to bend a new hard brake line before the rotor and disc brake caliper is installed.
We drained and refilled the transfer case,drained the tranny and installed a new filter, and pulled the radiator to have it cleaned out. Pitman and idler arms were also installed.
Next week it's time to get the driver side suspension installed.I have some driver's side floor pan rust to repair and that should be it for welding. We need to install new door hinge bushings and repair the driver's inside door handle.