Expecting to not have the lobe, but adding an electric LP fuel pump.
Machinist is doing something interesting to the 7120 head.
A proper welding under red-hot, etc., was cost prohibitive ($200+ per hole), and we couldn't come up with specific welding guides that wouldn't risk the head (not enough time).
He didn't feel confident of the long term viability of my JB-Welding the overhanging water ports.
He milled down over the triangular water holes to make them round, but with a ledge at the bottom. He's machining slightly less than 1" round to fit and will use a particular lock-tite to help seal them when he sets them in, and then ball-peen to merge the new steel into the cast, then it'll get flattened when he decks the head. He says there may be a slight colour difference, but otherwise it will likely be invisible, and lasting. There is a slight risk of a leak, but so small that he says any sealer would take care of it.
He likens it to a freeze-plug, but solid steel.