Managed to get into the money pit for a bit this past weekend but did not make much headway. I did get the driver side halfshaft out and decided to do the pass side one too so ordered that from Rockauto. I spent more time getting the garage heaters cleaned and working than actual car maintenance. They should be all set for the winter now, all I need to do is buy more pellets for the stove.
We did have a bit of snow that required my attention:
Since I ate way too much I was not highly motivated to crawl all over the car so I stood back and took an assessment of what needs to get done next. Looks like my list is still growing:
Remove and replace pass side halfshaft
replace all balljoints while halfshafts are out
hang front diff from engine mounts
bolt up tranny crossmember
install transfer case
install driveshafts
install radiator/hoses/belts
install bunches of small parts removed to get at engine bolts
install battery box and battery
fire up the new engine and see if it runs (it better!!!!!)
remove carpeting and install new
install shifter (maybe a B&M Starshifter)
install AC ducts and guages
install all new exhaust and cat
bleed brakes
replace fender damaged in shipping
drive and enjoy for many years to come. haha
Think I have a few more nights work to do huh?